New Technology

Who Is Regulating Regulatory Public Comments?

Madeleine Rossi, MJLST Staffer

In 2015 the Federal Communications Commission (FCC) issued a rule on “Protecting and Promoting the Open Internet.”[1] The basic premise of these rules was that internet service providers had unprecedented control over access to information for much of the public. Those in favor of the new rules argued that broadband providers should be required to enable access to all internet content, without either driving or throttling traffic to particular websites for their own benefit. Opponents of these rules – typically industry players such as the same broadband providers that would be regulated – argued that such rules were burdensome and would prevent technological innovation. The fight over these regulations is colloquially known as the fight over “net neutrality.” 

In 2017 the FCC reversed course and put forth a proposal to repeal the 2015 regulations. Any time that an agency proposes a rule, or proposes to repeal a rule, they must go through the notice-and-comment rulemaking procedure. One of the most important parts of this process is the solicitation of public comments. Many rules get put forth without much attention or fanfare from the public. Some rules may only get hundreds of public comments, often coming from the industry that the rule is aimed at. Few proposed rules get attention from the public at large. However, the fight over net neutrality – both the 2015 rules and the repeal of those rules in 2017 – garnered significant public interest. The original 2015 rule amassed almost four million comments.[2] At the time, this was the most public comments that a proposed rule had ever received.[3] In 2017, the rule’s rescission blew past four million comments to acquire a total of almost twenty-two million comments.[4]

At first glance this may seem like a triumph for the democratic purpose of the notice-and-comment requirement. After all, it should be a good thing that so many American citizens are taking an interest in the rules that will ultimately determine how they can use the internet. Unfortunately, that was not the full story. New York Attorney General Letitia James released a report in May of 2021 detailing her office’s investigation into wide ranging fraud that plagued the notice-and-comment process.[5] Of the twenty-two million comments submitted about the repeal, a little under eight million of them were generated by a single college student.[6] These computer-generated comments were in support of the original regulations, but used fake names and fake comments.[7] Another eight million comments were submitted by lead generation companies that were hired by the broadband companies.[8] These companies stole individuals’ identities and submitted computer-generated comments on their behalf.[9] While these comments used real people’s identities, they fabricated the content in support of repealing the 2015 regulations.[10]

Attorney General James’ investigation showed that real comments, submitted by real people, were “drowned out by masses of fake comments and messages being submitted to the government to sway decision-making.”[11] When the investigation was complete, James’ office concluded that nearly eighteen of the twenty-two million comments received by the FCC in 2017 were faked.[12] The swarm of fake comments created the false perception that the public was generally split on the issue of net neutrality. In fact, anywhere from seventy-five to eighty percent of Americans say that they support net neutrality.[13]

This is not an issue that is isolated to the fight over net neutrality. Other rulemaking proceedings have been targeted as well, namely by the same lead generation firms involved in the 2017 notice-and-comment fraud campaign.[14] Attorney General James’ investigation found that regulatory agencies like the Environmental Protection Agency (EPA), which is responsible for promulgating rules that protect people and the environment from risk, had also been targeted by such campaigns.[15] When agencies like the FCC or EPA propose regulations for the protection of the public, the democratic process of notice-and-comment is completely upended when industry players are able to “drown out” real public voices.

So, what can be done to preserve the democratic nature of the notice-and-comment period? As the technology involved in these schemes advances, this is likely to become not only a reoccurring issue but one that could entirely subvert the regulatory process of rulemaking. One way that injured parties are fighting back is with lawsuits.

In May of 2023, Attorney General James announced that she had come to a second agreement with three of the lead generation firms involved with the 2017 scam to falsify public comments.[16] The three companies agreed to pay $615,000 in fines for their involvement.[17] This agreement came in addition to a previous agreement in which the three stipulated to paying four million dollars in fines and agreed to change future lead generating practices, and the litigation is ongoing.[18]

However, more must be done to ensure that the notice-and-comment process is not entirely subverted. Financial punishment after the fact does not account for the harm to the democratic process that is already done. Currently, the only recourse is to sue these companies for their fraudulent and deceptive practices. However, lawsuits will typically only result in financial losses. Financial penalties are important, but they will always come after the fact. Once litigation is under way, the harm has already been done to the American public.

Agencies need to ensure that they are keeping up with the pace of rapidly evolving technology so that they can properly vet the validity of the comments that they receive. While it is important to keep public commenting a relatively open and easy practice, having some kind of vetting procedure has become essential. Perhaps requiring an accompanying email address or phone number for each comment, and then sending a simple verification code. Email or phone numbers could also be contacted during the vetting process once the public comment period closes. While it would likely be impractical to contact each individual independently, a random sample would at least flag whether or not a coordinated and large-scale fake commenting campaign had taken place. 

Additionally, the legislature should keep an eye on fraudulent practices that impact the notice-and-comment process. Lawmakers can and should strengthen laws to punish companies that are engaged in these practices. For example, in Attorney General James’ report she recommends that lawmakers do at least two things. First, they should explicitly and statutorily prohibit “deceptive and unauthorized comments.”[19] To be effective these laws should establish large civil fines. Second, the legislature should “strengthen impersonation laws.”[20] Current impersonation laws were not designed with mass-impersonation fraud in mind. These statutes should be amended to increase penalties when many individuals are impersonated.

In conclusion, the use of fake comments to sway agency rulemaking is a problem that is only going to worsen with time and the advance of technology. This is a serious problem that should be taken as such by both agencies and the legislature. 

Notes

[1] 80 Fed. Reg. 19737.

[2] https://www.brookings.edu/articles/democratizing-and-technocratizing-the-notice-and-comment-process/.

[3] Id.

[4] Id.

[5] https://ag.ny.gov/press-release/2021/attorney-general-james-issues-report-detailing-millions-fake-comments-revealing.

[6] https://www.brookings.edu/articles/democratizing-and-technocratizing-the-notice-and-comment-process/.

[7] Id.

[8] Id.

[9] Id.

[10] Id.

[11] https://ag.ny.gov/press-release/2021/attorney-general-james-issues-report-detailing-millions-fake-comments-revealing.

[12] Id.

[13] https://thehill.com/policy/technology/435009-4-in-5-americans-say-they-support-net-neutrality-poll/, https://publicconsultation.org/united-states/three-in-four-voters-favor-reinstating-net-neutrality/.

[14] Id.

[15] https://apnews.com/article/settlement-fake-public-comments-net-neutrality-ae1f69a1f5415d9f77a41f07c3f6c358.

[16] Id.

[17] Id.

[18] https://apnews.com/article/government-and-politics-technology-business-9f10b43b6aacbc750dfc010ceaedaca7.

[19] https://ag.ny.gov/sites/default/files/oag-fakecommentsreport.pdf.

[20] Id.


A New Iron Age: New Developments in Battery Technology

Poojan Thakrar, MJLST Staffer

Introduction

In coming years, both Great River Energy and Xcel Energy are installing pilot projects of a new iron-air battery technology.[1] Both utilities are working with Boston-based company Form Energy. Great River Energy, which is Minnesota’s second-largest energy provider, plans to install a 1.5-megawatt battery next to its natural gas plant in Cambridge, MN. Xcel Energy, the state’s largest energy provider, will deploy a 10-megawatt battery in Becker, MN and Pueblo, CO. The batteries can store energy for up to 100 hours, which the utilities emphasize as crucial due to their ability to provide power during multi-day blizzards. The projects may be online as early as 2025, Form Energy says.[2]

The greater backdrop for these battery projects is Minnesota’s new carbon-free targets. Earlier this year, with new control of both chambers, Minnesota Democrats passed a bill mandating 100 percent carbon-free energy by 2040.[3] Large utility-scale batteries such as the ones proposed by Great River Energy and Xcel can play an important role in that transition by mitigating intermittency concerns often associated with renewables.

Technology

This technology may be uniquely suited for a future in which utilities rely more heavily on batteries. While this technology is less energy-dense than traditional lithium-ion batteries, the iron used at the heart of the battery is more abundant than lithium. [4] This allows utilities to sidestep many of the concerns associated with lithium and other minerals required in traditional batteries.[5] Iron-air batteries also tend to be heavier and larger than lithium-ion batteries that store equivalent energy. For batteries in phones, laptops, and cars, weight and volume are important features to keep in mind. However, this new technology could help accelerate uptake of large utility-scale batteries, where weight and volume are of less concern.

If your high school chemistry is rust-y, take a look at this graphic by Form Energy. When discharging electricity, the battery ‘inhales’ oxygen from the air and converts pure iron into rust. This allows electrons to flow, as seen on the right side of the graphic. As the battery is charged, the rust ‘exhales’ oxygen and converts back to iron. The battery relies on this reversible rust cycle to ultimately store its electricity. Form Energy claims that its battery can store energy at one-tenth the cost of lithium-ion batteries.[6]

Administrative Procedures

Xcel has recently filed a petition with the Minnesota Public Utilities Commission (MPUC), which has jurisdiction over investor-owned utilities such as Xcel.[7] The March 6th petition seeks to recover the cost of the pilot battery project. This request was made pursuant to Minnesota statute 216B.16, subd. 7e, which allows a utility to recover costs associated with energy storage system pilot projects.

In addition, the pilot project qualifies for a standard 30 percent investment tax credit (ITC) as well as a 10 percent bonus under the federal Inflation Reduction Act because Becker, MN is an “energy community.”  An “energy community” is an area that formerly had a coal mine or coal-fired power plant that has since closed. Becker is home to the Sherco coal-fired power plant, which has been an important part of that city’s economy for decades. The pilot may also receive an additional 10 percent bonus through the IRA because of the battery’s domestic materials. Any cost recovery through a rider would only be for costs beyond applicable tax grants and potential future grant awards. The MPUC has opened a comment period until April 21st, 2023. The issue at hand is: should the Commission approve the Long Duration Energy Storage System Pilot proposed by Xcel Energy in its March 6, 2023 petition? [8]

As a member-owned cooperative, Great River Energy does not need approval from the MPUC to recover the price of the battery project through its rates.

Conclusion

Ultimately, this is a bet on an innovative technology by two of the largest electricity providers in the state. If approved by the MPUC, ratepayers will foot the bill for this new technology. However, new technology and large investment projects are crucial for a cleaner and more resilient energy future.

Notes

[1] See Kirsti Marohn, ‘Rusty’ batteries could hold key to Minnesota’s carbon-free power future, MPR News (Feb. 10, 2023), https://www.mprnews.org/story/2023/02/10/rusty-batteries-could-hold-key-to-carbonfree-power-future. See alsoRyan Kennedy, Retired coal sites to host multi-day iron-air batteries, PV Magazine (Jan. 26, 2023) https://pv-magazine-usa.com/2023/01/26/retired-coal-sites-to-host-multi-day-iron-air-batteries/.

[2] Andy Colthorpe, US utility Xcel to put Form Energy’s 100-hour iron-air battery at retiring coal power plant sites, Energy Storage News (Jan. 27, 2023), https://www.energy-storage.news/us-utility-xcel-to-put-form-energys-100-hour-iron-air-battery-at-retiring-coal-power-plant-sites/.

[3] Dana Ferguson, Walz signs carbon-free energy bill, prompting threat of lawsuit, MPR News (Feb. 7, 2023), https://www.mprnews.org/story/2023/02/07/walz-signs-carbonfree-energy-bill-prompting-threat-of-lawsuit.

[4] Form Energy Partners with Xcel Energy on Two Multi-day Energy Storage Projects, BusinessWire (Jan. 26, 2023), https://www.businesswire.com/news/home/20230126005202/en/Form-Energy-Partners-with-Xcel-Energy-on-Two-Multi-day-Energy-Storage-Projects

[5]See Amit Katwala, The Spiralling Environmental Cost of Our Lithium Battery Addiction, Wired UK (May 8, 2018), https://www.wired.co.uk/article/lithium-batteries-environment-impact/. See also The Daily, The Global Race to Mine the Metal of the Future, New York Times (Mar. 18, 2022), https://www.nytimes.com/2022/03/18/podcasts/the-daily/cobalt-climate-change.html

[6] https://formenergy.com/technology/battery-technology/ (last visited Apr. 6, 2023)

[7] Petition Long-Duration Energy Storage System Pilot Project at Sherco, page 4, Minnesota PUC (Mar 6, 2023),

https://www.edockets.state.mn.us/edockets/searchDocuments.do?method=showPoup&documentId={8043C886-0000-CC18-A0DF-1A2C7EA08FA1}&documentTitle=20233-193670-01

[8] Notice of Comment Period, Minnesota PUC (Mar 21, 2023),

https://www.edockets.state.mn.us/edockets/searchDocuments.do?method=showPoup&documentId={90760487-0000-C415-89F7-FDE36D038B2C}&documentTitle=20233-194113-01